Difference between revisions of "SmartLink"

From Dot2DotCommunications
Jump to: navigation, search
(Creating Light Schedules)
(Subcontract Specific Lighting)
 
(23 intermediate revisions by one user not shown)
Line 1: Line 1:
The SmartLink module allows you to send lighting control commands to the SmartLink system, allowing you to have default lighting schedules for faces, as well as lighting control schedules for campaigns.
+
This extension module communicates directly with OutdoorLink's SmartLink system, allowing you to manage the lighting on each panel based on AdManager posting schedule dates, specifically the Completed On date for the Posting Task and the Ends On date for the Posting.  You can set it up so that the lights are on only when there is an active posting on the face in which case your daily publish will automatically turn off the lights if the active posting has expired and the next scheduled posting, if any, has not yet been installed.  You can define different light schedules with 1, 2 or no lighting and each face with SmartLink lighting controls can be set to use a specific light schedule.  Futhermore, you can easily assign special lighting needs for a campaign by overriding the light schedule for the subcontract.
  
 
==Initial Setup==
 
==Initial Setup==
 +
 +
===Options===
  
 
Go to Tools-Options-SmartLink.
 
Go to Tools-Options-SmartLink.
  
 +
[[File:SmartLinkToolsOptions.png]]
  
From this screen you can enter the license information that allows you to connect to the SmartLink system.  You can enter your license key (provided by OutdoorLink), along with the specified User id and password.  You can test your connection by clicking the Test button to ensure the information has been successfully entered.
 
  
Next, set up the default light schedule you wish to apply to faces in Ad ManagerNote this will only take effect if you have specified the SmartLink details for the Face, but have not supplied a light schedule to follow.
+
In the Connection section, provide the information that allows you to connect to the SmartLink systemEnter your license key provided by OutdoorLink, along with the specified User id and password.  You can test your connection by clicking the Test button to ensure the information has been successfully entered.
  
[[File:SmartLinkToolsOptions.png]]
+
In the Default Light Schedule section, define your most commonly used light schedule that you wish to apply to faces in Ad Manager.  This default light schedule will take effect if you have specified the SmartLink details for the Face, but have not supplied a specific light schedule for the Face.
  
Once you have entered the appropriate information, click OK.
+
In the Expired Posting Policy section, if the checkbox is ticked then Ad Manager will turn off the lights if the active posting at the face is expired.
  
==Creating Light Schedules==
+
Once you have entered the appropriate information, click OK to save the options.
  
Go to the SmartLink Folder in the Tree View and open the SmartLink folder.  Click All Light Schedules. In the List view, right click and choose New.
+
===Enable SmartLink Publishing for Faces===
  
From here you can create Light Schedules that define on/off times to light your facesGive the schedule a meaningful name and code and specify when you wish to enable the lights. After you have created the schedule, you can click Save.
+
In addition to the SmartLink connection credential, you must also provide SmartLink information for each AdManager faceEach OutdoorLink light control is uniquely identified by its Plant, Structure, and Panel and this information must be added to the corresponding AdManager face. Open the detail view for the face and click on the SmartLink tab.  Tick the checkbox labelled SmartLink controlled, enter the Plant, Structure, and Panel information, and save your changes.  The Light schedule combo box is used to assign a schedule to the face as discussed below.
  
[[File:SmartLinkNewSchedule.JPG]]
+
Please note that if the OutdoorLink information is not entered correctly, Ad Manager will not be able to send the lighting schedule command to the lighting controller.
 +
 
 +
[[File:FaceSmartLinkTab.png]]
 +
 
 +
==Creating Light Schedules==
 +
 
 +
In the main AdManager window, open the SmartLink Folder in the Tree View and select All LightSchedules. In the List view, right click and choose New.
 +
 
 +
In the Light Schedule - Details view, specify details for the schedule.  Give the schedule a meaningful name and code.  Use the Schedule type combo box to choose whether the schedule has no lights (Always Off), one period or two periods of lighting.  Specify the on and off times for the period(s) of lighting or choose to use sunset/sunrise as configured in SmartLink.  Finally, click Save to create the schedule.
  
 
[[File:SmartLinkNewSchedule.png]]
 
[[File:SmartLinkNewSchedule.png]]
Line 30: Line 40:
 
===Single Face===
 
===Single Face===
  
To update a single face with a lighting schedule, go to the Face and go to the SmartLink tab.  From this tab you can mark the face as having its lighting controlled by SmartLink.  After you have done this, you can select the default light schedule to apply to this  Face. If you leave the Light Schedule blank, the Default schedule set under Tools-Options will be used.
+
To update a single face with a lighting schedule, open the Face detail view and go to the SmartLink tab.  The face must be SmartLink controlled as described above in Initial SetupChoose the desired lightschedule for the face from the Light schedule combo box. If you leave the Light schedule blank, the Default schedule defined in Tools-Options will be used.
  
The next step is to identify the Plant, Structure and Panel information provided by OutdoorLink for this Face.  Once this information has been entered, click Save.  Please note that if this information is not entered correctly, Ad Manager will not be able to send the lighting schedule information to the SmartLink controller.
+
===Multiple Faces at a Time===
  
[[File:SmartLinkFaceSchedule.JPG]]
+
If you wish to update multiple faces at a time, in a list of faces highlight a selection of faces, right click and choose Update Light Schedule.  Tick the check box beside Light Schedule to enable the combo box where you can choose the light schedule for the faces.  Click OK to update the faces.  If you leave the combo box blank, the Default schedule defined in Tools-Options will be used for the faces.
  
 +
[[File:SmartLinkUpdateLightSchedule.png]]
  
===Multiple Faces at a Time===
+
==Subcontract Specific Lighting==
  
If you wish to update multiple faces at a time, highlight the faces, right click and select Update Light Schedule.  You can click the check box below SmartLink Enabled and change the value to "Yes" and you can specify the default light schedule for these faces. If you leave the Light Schedule blank, the Default schedule set under Tools-Options will be used.
+
Ad Manager allows you to specify lighting overrides for a campaign, if desired.  You can choose:
 +
*a specific light schedule for all postings in the campaign
 +
*an Expiry policy for the campaign
  
[[File:SmartLinkUpdateLightSchedule.JPG]]
+
If you wish to use this feature, go to the Subcontract - Detail and click on the SmartLink tab.
  
 +
To apply a specific light schedule for the subcontract, select the desired light in the Light schedule combo box.  This light schedule will be used for all postings in the subcontract, overriding  the schedule that is set at the Face or the Default schedule defined in Tools Options.
  
Please note that after you have updated these faces via this tool, you will still need to visit each face to enter its SmartLink credentials as described under the Single Face methodology.
+
For the expiry policy you can choose to use the system policy set in Tools Options, or you can set a custom policy for the subcontract.  For the custom policy, use the check box to specify if the lights should be turned off when a posting has expired.
  
 +
Click Save after you have made any changes to the subcontract.
  
==Assigning Light Schedules to Subcontracts==
+
[[File:SmartLinkSubcontract.png]]
  
Ad Manager allows you to specify a specific light schedule to use for a campaign, if desired.
+
NOTE: If you wish to update the light schedule for multiple Subcontracts, highlight the Subcontracts in a List View, right click and select Update Light Schedule.  Click the Light Schedule check box, choose the desired light schedule in the combo box, then click OK.
  
If you wish to use this feature, open the Subcontract and click on the SmartLink tab.  Select the light schedule to be applied to all SmartLink controlled faces on this Subcontract.  This lighting schedule will override the default schedule. If a light schedule is not applied to a Subcontract, the default schedule for each Face will be used. Click Save after you have selected the desired schedule. 
+
==Publishing Light Schedules to SmartLink==
  
 +
=== Force Option ===
  
[[File:SmartLinkSubcontractSchedule.JPG]]
+
Ad Manager tracks, for each face, the last light schedule that was published to SmartLink.  When publishing, normally Ad Manager will only send a command to SmartLink if the light schedule needs to be changed.  This is done to reduce the amount of data that SmartLink sends out to the lighting control units.  The "Force" option tells Ad Manager to just send the light schedule without comparing.  This is useful if the Ad Manager cache is not in sync with the light schedule that is being used at the panel, e.g. you use the SmartLink website to change the light schedule.
  
If you wish to update multiple Subcontracts with the same lighting schedule, highlight the Subcontracts in a List View, right click and select Update Light Schedule.  Click the check box, choose the desired light schedule, then click OK.
+
=== Manual Publishing ===
  
 +
[[File:SmartLinkPublishingOptions.png]]
  
==Publishing Light Schedules to SmartLink==
+
When you publish manually, the above dialog allows you to choose the Force option.  When you click OK, a progress dialog opens showing publishing details and results for each face.  On completion a summary of the process lets you know how many succeeded, failed, did not need updating, and require attention because they are expired.  Additionally, the results are output to a log file.  Check your AppData folder for Dot2Dot\SmartLink Add-in\Logs\SmartLinkPublisher_db-yyyy-mm-dd.log, where db is the name of your database.
 
+
=== Manually ===
+
  
If you wish to send all lighting schedules to SmartLink immediately, go to Tools-SmartLink-Publish SmartLink Schedules. Additional options will be available to allow you to turn off lights for expired postings and whether to re-send all light schedules.
+
'''All Faces:''' If you wish to send light schedules for all SmartLink controlled Faces, use Tools-SmartLink-Publish Schedules to SmartLink from the main Ad Manager page.
  
Click Ok to proceed, and progress information for each face and on completion will appear with a summary of the resultsLog entries are also displayed.
+
'''Selected Face(s):''' You can publish the light schedule for a single face or a selection of faces.  On the Face - Details page, use Tools-Publish Schedule to SmartLinkIf you are viewing a list of faces, select one or more faces, right-click on the selection and choose Publish Schedule to SmartLink from the context menu.
  
To send schedule for a single face, open the Face and run Tools-Publish Lightschedule.
+
'''Subcontract:''' You can publish the lightschedule for the contracted faces of a subcontract.  On the Subcontract - Details page, choose Tools-Publish Schedule to SmartLink.  If viewing a list of subcontracts, select one, right-click on the selected subcontract and choose Publish Schedule to SmartLink from the context menu.
  
===Scheduled===
+
=== Scheduled Publishing ===
  
A scheduled task can be configured to run daily to update light schedules after your day's postings have been entered into Ad Manager as completed.  Log entries can be viewed for results of publishing.
+
A scheduled task can be configured to run daily to update light schedules after your day's postings have been entered into Ad Manager as completed.  A configuration xml file is used to specify publishing options.

Latest revision as of 12:12, 25 October 2016

This extension module communicates directly with OutdoorLink's SmartLink system, allowing you to manage the lighting on each panel based on AdManager posting schedule dates, specifically the Completed On date for the Posting Task and the Ends On date for the Posting. You can set it up so that the lights are on only when there is an active posting on the face in which case your daily publish will automatically turn off the lights if the active posting has expired and the next scheduled posting, if any, has not yet been installed. You can define different light schedules with 1, 2 or no lighting and each face with SmartLink lighting controls can be set to use a specific light schedule. Futhermore, you can easily assign special lighting needs for a campaign by overriding the light schedule for the subcontract.

Contents

Initial Setup

Options

Go to Tools-Options-SmartLink.

SmartLinkToolsOptions.png


In the Connection section, provide the information that allows you to connect to the SmartLink system. Enter your license key provided by OutdoorLink, along with the specified User id and password. You can test your connection by clicking the Test button to ensure the information has been successfully entered.

In the Default Light Schedule section, define your most commonly used light schedule that you wish to apply to faces in Ad Manager. This default light schedule will take effect if you have specified the SmartLink details for the Face, but have not supplied a specific light schedule for the Face.

In the Expired Posting Policy section, if the checkbox is ticked then Ad Manager will turn off the lights if the active posting at the face is expired.

Once you have entered the appropriate information, click OK to save the options.

Enable SmartLink Publishing for Faces

In addition to the SmartLink connection credential, you must also provide SmartLink information for each AdManager face. Each OutdoorLink light control is uniquely identified by its Plant, Structure, and Panel and this information must be added to the corresponding AdManager face. Open the detail view for the face and click on the SmartLink tab. Tick the checkbox labelled SmartLink controlled, enter the Plant, Structure, and Panel information, and save your changes. The Light schedule combo box is used to assign a schedule to the face as discussed below.

Please note that if the OutdoorLink information is not entered correctly, Ad Manager will not be able to send the lighting schedule command to the lighting controller.

FaceSmartLinkTab.png

Creating Light Schedules

In the main AdManager window, open the SmartLink Folder in the Tree View and select All LightSchedules. In the List view, right click and choose New.

In the Light Schedule - Details view, specify details for the schedule. Give the schedule a meaningful name and code. Use the Schedule type combo box to choose whether the schedule has no lights (Always Off), one period or two periods of lighting. Specify the on and off times for the period(s) of lighting or choose to use sunset/sunrise as configured in SmartLink. Finally, click Save to create the schedule.

SmartLinkNewSchedule.png

Assigning Light Schedules to Faces

When assigning a light schedule to a Face, you can either do this one face at a time, or multiple faces at a time.

Single Face

To update a single face with a lighting schedule, open the Face detail view and go to the SmartLink tab. The face must be SmartLink controlled as described above in Initial Setup. Choose the desired lightschedule for the face from the Light schedule combo box. If you leave the Light schedule blank, the Default schedule defined in Tools-Options will be used.

Multiple Faces at a Time

If you wish to update multiple faces at a time, in a list of faces highlight a selection of faces, right click and choose Update Light Schedule. Tick the check box beside Light Schedule to enable the combo box where you can choose the light schedule for the faces. Click OK to update the faces. If you leave the combo box blank, the Default schedule defined in Tools-Options will be used for the faces.

SmartLinkUpdateLightSchedule.png

Subcontract Specific Lighting

Ad Manager allows you to specify lighting overrides for a campaign, if desired. You can choose:

  • a specific light schedule for all postings in the campaign
  • an Expiry policy for the campaign

If you wish to use this feature, go to the Subcontract - Detail and click on the SmartLink tab.

To apply a specific light schedule for the subcontract, select the desired light in the Light schedule combo box. This light schedule will be used for all postings in the subcontract, overriding the schedule that is set at the Face or the Default schedule defined in Tools Options.

For the expiry policy you can choose to use the system policy set in Tools Options, or you can set a custom policy for the subcontract. For the custom policy, use the check box to specify if the lights should be turned off when a posting has expired.

Click Save after you have made any changes to the subcontract.

SmartLinkSubcontract.png

NOTE: If you wish to update the light schedule for multiple Subcontracts, highlight the Subcontracts in a List View, right click and select Update Light Schedule. Click the Light Schedule check box, choose the desired light schedule in the combo box, then click OK.

Publishing Light Schedules to SmartLink

Force Option

Ad Manager tracks, for each face, the last light schedule that was published to SmartLink. When publishing, normally Ad Manager will only send a command to SmartLink if the light schedule needs to be changed. This is done to reduce the amount of data that SmartLink sends out to the lighting control units. The "Force" option tells Ad Manager to just send the light schedule without comparing. This is useful if the Ad Manager cache is not in sync with the light schedule that is being used at the panel, e.g. you use the SmartLink website to change the light schedule.

Manual Publishing

SmartLinkPublishingOptions.png

When you publish manually, the above dialog allows you to choose the Force option. When you click OK, a progress dialog opens showing publishing details and results for each face. On completion a summary of the process lets you know how many succeeded, failed, did not need updating, and require attention because they are expired. Additionally, the results are output to a log file. Check your AppData folder for Dot2Dot\SmartLink Add-in\Logs\SmartLinkPublisher_db-yyyy-mm-dd.log, where db is the name of your database.

All Faces: If you wish to send light schedules for all SmartLink controlled Faces, use Tools-SmartLink-Publish Schedules to SmartLink from the main Ad Manager page.

Selected Face(s): You can publish the light schedule for a single face or a selection of faces. On the Face - Details page, use Tools-Publish Schedule to SmartLink. If you are viewing a list of faces, select one or more faces, right-click on the selection and choose Publish Schedule to SmartLink from the context menu.

Subcontract: You can publish the lightschedule for the contracted faces of a subcontract. On the Subcontract - Details page, choose Tools-Publish Schedule to SmartLink. If viewing a list of subcontracts, select one, right-click on the selected subcontract and choose Publish Schedule to SmartLink from the context menu.

Scheduled Publishing

A scheduled task can be configured to run daily to update light schedules after your day's postings have been entered into Ad Manager as completed. A configuration xml file is used to specify publishing options.